Destructive Testing

In-house destructive and non-destructive testing for coating performance verification.

3
Core Tests
ISO:9001
Integrated
In-House
Testing & Inspection

In-House Testing and Inspection Capability

Wicked Coatings has in-house testing and inspection capability, covering both destructive and non-destructive testing to analyse and verify coating performance before, during and after production. Testing is carried out on sample specimens to failure, providing definitive data on how the coating system performs when subject to different mechanical and chemical stresses.

Destructive testing is most suitable and economical for mass-produced items, where destroying a small number of specimens is negligible compared to the assurance it provides across the entire production run. For commercial clients, this documented evidence confirms that the coating system meets the required specification before full production begins.

Three Tests That Prove the Coating

Our in-house testing and inspection team performs the core destructive tests used to qualify coating systems for commercial and regulated production.

From Specimen to Signed-Off Data

Every destructive test follows a repeatable workflow that ties directly back to the coating batch it represents.

  1. science
    STEP 01

    Specimen Prep

    Representative coupons are coated alongside the production batch using the same substrate, primer and topcoat system.

  2. schedule
    STEP 02

    Cure & Condition

    Coupons are cured under production conditions and conditioned for the specified dwell time before testing begins.

  3. construction
    STEP 03

    Destructive Test

    Cross-hatch, pencil hardness and solvent sensitivity tests are carried out in sequence against the defined specification.

  4. assignment
    STEP 04

    Grade & Record

    Results are graded against international standards, photographed where required, and logged against the production batch.

  5. description
    STEP 05

    Report Issued

    A full test report is issued and retained in our ISO:9001 records, available to the client as part of the quality pack.

3
Core Test Methods
ISO:9001
Managed
NACE 3
Inspectors
100%
Batch Records
In-House
Testing

Evidence the Coating Performs

Our destructive testing capability is fully integrated into our ISO:9001 quality management system, so the data is always tied to the job it represents.

  • workspace_premium ISO:9001 Integration Test specifications, records and reports are held within our certified quality management system and retained for every production batch.
  • shield Regulated Sector Ready Particularly important for aerospace, military and medical clients where documented coating performance data is a mandatory part of the quality pack.
  • description Supplied as Quality Pack Test reports can be issued alongside coating certificates and inspection records, giving clients a complete, auditable project file.

Qualify Your Coating With Confidence

Contact us to discuss destructive testing requirements for your project. We will confirm which tests are relevant, how specimens should be prepared and what reporting you need.